PERSISTENT GROUND STATION
Armorb M8.
Tethered high-intensity lighting and underground comms relay — 24 hours of continuous downward light and Mesh backhaul where radio doesn't reach. One person. One case. No diesel noise.
What M8 replaces underground
Diesel light towers
Silent operation — zero fumes, zero refueling shifts, zero ventilation load. Replaces towable diesel towers with tethered LED arrays.
◉ 0 dB engine noise
Dead-zone comms
Optical-composite micro tether carries continuous power up while Mesh relay backhauls radio underground — multiple hops through rock.
◉ 24 h persistence
Generator logistics
Pairs with a portable industrial power station — one-person, one-case deployment replaces fuel logistics entirely.
◉ Single-case deploy
Cable spaghetti
One composite tether: power + data + signal. Auto-tensioned, field-reelable, rated for repeated underground cycles.
◉ 1 tether · 3 functions
The X3 + M8 + Power workflow
M8 establishes persistent light and relay at the shaft or manhole. X3 launches through the 450 mm opening, flies the dark, maps the void, and streams back through the Mesh chain. The portable industrial power station runs the whole shift silently. Zero diesel. Zero fumes. Zero people underground.
- 01 · M8 deploys — light + relay live in minutes
- 02 · X3 launches — SLAM mapping in total darkness
- 03 · Power station sustains the full shift
